Drilling, loading and hauling in a hard-rock open pit: cost per tonne and net present value. Rebuilt from a 1996 Montanuniversität Leoben diploma thesis.
Method: owning cost by annuity (capital service), operating cost by hour, variable cost scaled to tonnes produced, units rounded up. NPV: purchase at year 0 and at each replacement, annual operating cost at year-end, no residual value at the horizon. Inputs are saved on this device.